Wednesday 28 November 2007

Wednesday, 28th November - Countdown time.

The pulpit is now back in place, ready for the audio wiring and hearing loop to be laid and connected. It's structure was checked before it was re-installed.

Work is continuing on the tea bar and toilet area. The internal walls have been plastered and the tea bar and toilet are being fitted out. The balustrade is now in place, but incomplete.

The internal door has already been shortened, and the external door has been removed for shortening today, to accommodate the new floor level. It will be rehung by the end of the day to ensure the church is secured overnight.

Some of the original tiles have been used in the entrance, around and inside the tea bar, lobby and toilet areas. Recycled blown glass was used for the sub floor and the floor timber is from sustainable forests.