Saturday 24 November 2007

Saturday, 24th November - New tarmac

The trench has been backfilled and the footpath and road have been re-covered with tarmac. The road works signage will be removed on Monday.

Further tarmac will be placed on the sections of the church path which have been disturbed, especially at the entrance of the church where the section between the inner and outer doors meets the entrance of the church and the new floor level inside.

Adjustments are being made to the church path for a graduated slope now the step has been removed for practical purposes. This will make a smooth path all the way from the road to the church door.

Please note! This does NOT mean that the slope is suitable for disability access. The entrance on Station Road will remain the correct entrance to use.
The contractor is working today and plans to complete installation of the wood floor by Tuesday. Currently, the south section is being worked on, but the nave and bell tower have been laid.

On Friday, the walls in the tea-bar and the lobby/toilet wall were being installed. Small windows will be placed in both the tea-bar and toilet to block off where their walls overlap the church exterior window.