Saturday, 17 November 2007

Monday, 5th November - Under floor heating

Work began on laying the wooden battens over the limecrete floor for the under floor heating.

These were covered with insulation leaving an air gap underneath for any moisture to escape.

The electricians are continuing with their first fixing in the teabar and toilet areas.