The walls have been re-plastered mainly on the north wall and some on the south wall, where necessary, and painting the nave will start next week.
The new heating header tank has been installed in the vestry with all the relevant plumbing. This replaces the old tank in the bell tower.
The trench has now been backfilled covering the new drain and the water -pipe, apart from the lych gate. The final connection and backfilling is planned for Monday, 5th November, so beware some small roadworks on Main St. that day.
No comments:
Post a Comment